This study has demonstrated that artificial concrete pillars can stabilize the active stopes, especially in broader sections of the orebodies intercepted with geotechnical challenges such as high-stress change, spalling, slabbing, sloughing, etc. FLAC3D numerical code was successfully used to...
Download PDF ↓Search Results
Since 1995, Konkola Mine No.1 Shaft in Zambia has been experiencing increased seismic activity, leading to more rockburst incidents, which could present significant safety and production challenges at deeper levels. This study aimed to develop tools to predict rockburst from microseismic and...
Download PDF ↓Mining at Kansanshi is currently conducted in two pits namely Main and North West pit. Mining at both pits is conducted by conventional open pit methods involving 18 hydraulic excavators and a mining fleet of haul 86 trucks.There has a been a general concern on the mined material tonnes...
Download PDF ↓Nchanga Open Pit (NOP) is facing a critical equipment planning decision after undertaking improvement projects at the processing plant namely Elevated Temperature Leaching, Heap Leaching and Cobalt/Copper separation. Elevated Temperature Leaching has resulted in 20% increase in the recovery of...
Download PDF ↓Temperatures and humidity at Mindola Sub-Vertical (MSV) shaft have been rising with depth as mining of lower lying copper reserves is achieved. This rise in temperature has been catalysed by a number factors notably the increase of diesel equipment, geothermal gradient (increase in depth), auto...
Download PDF ↓