Mwamba, Sarah Nsama
2018·University of Zambia

Risk Management has become key in ensuring stable networks. The greatest risk that service Providers (SPs) face is client, revenue and reputation damage. To avoid or mitigate these risks a good client management plan is required. With the ever increasing competition in the Telecommunication...

Download PDF ↓
Banda, Floyd
2018·Doctor of Philosophy·University of Zambia

The practice of copper wire drawing has faced problems regarding process, quality and manufacturing cost and satisfying world market demand of drawn wires. Of great importance to the practitioner are problems due to the interaction of process parameters during wire drawing. The present research...

Download PDF ↓
Tshenyego, Lamong
2018·Master of Engineering·University of Zambia

Water abstraction is achieved by many means, and for many purposes. Abstraction depends on many variables that include the purpose for the abstraction, the location, the type of laws in place regarding the procedure, and the type of resources available for the abstraction process. The overall...

Download PDF ↓
Mwenya, Teddy
2018·University of Zambia

Zambia has been experiencing population increase over the years. The growth has been characterised by an increase in agricultural irrigation activities, competitiveness in water use which have caused water stress and conflicts in some catchments. Some water availability assessment works in...

Download PDF ↓
Chabe, Patrick
2018·Master of Engineering·University of Zambia

Management of Non-Revenue Water (NRW) has been undergoing several and continuous transformations over the past two decades. The International Water Association (IWA) as well as other key stakeholders have been trying to find the ‘Best Practices’ in managing non-revenue water so as to help water...

Download PDF ↓
Kaela, Percy
2018·Master of Engineering·University of Zambia

In 2015 unparalleled energy crisis was experienced due to depleted energy stocks in the hydroelectric dams and reduced river flows in the Kafue and Zambezi river basin and the northern water circuit. In the past, energy profile of Zambia showed serious imbalance due to over dependence on one...

Download PDF ↓
Musambo, Manengu
2017·Master of Engineering·University of Zambia

In the Vision 2030 Strategic Focus document, the Government of Zambia aims to provide wholesome water supply to all Zambians by the year 2030. Against this background, the Lusaka Water and Sewerage Company (LWSC) implemented a water distribution network (WDN) project in Hillview South in 2012 in...

Download PDF ↓
Musambo, Manengu
2017·Master of Engineering·University of Zambia

In the Vision 2030 Strategic Focus document, the Government of Zambia aims to provide wholesome water supply to all Zambians by the year 2030. Against this background, the Lusaka Water and Sewerage Company (LWSC) implemented a water distribution network (WDN) project in Hillview South in 2012 in...

Download PDF ↓
Nundwe, Moses
2017·Master of Engineering·University of Zambia

Electricity is central to the development of any economy and in Zambia most of this energy is generated from hydropower plants. Projects for construction of electricity Transmission lines are often delayed therefore some towns which were not connected to the national grid are underdeveloped...

Download PDF ↓
Nundwe, Moses
2017·Master of Engineering·University of Zambia

Electricity is central to the development of any economy and in Zambia most of this energy is generated from hydropower plants. Projects for construction of electricity Transmission lines are often delayed therefore some towns which were not connected to the national grid are underdeveloped...

Download PDF ↓