2019ThesesDoctoral

Developing Strategies for Improving Implementation of Public Sector Construction Projects in Zambia

BANDA, Joshua

The purpose of the study was to develop strategies and a framework for successful implementation of public sector construction projects in Zambia. An exploratory sequential mixed method was used. The major findings were that there were twelve (12) key challenges and eleven (11) possible Critical Success Factors (CSFs) affecting performance of public sector construction projects in Zambia. Established also were varying relationships between Critical Success Factors and successful implementation of public sector construction projects represented by various success criteria. It was however noted that Critical Success Factors determined the performance of construction projects. It was concluded that using established relationships, strategies and framework for performance measurement during implementation of public sector construction projects could greatly contribute to improvement of the construction industry

Field of study derived

Standard field from OpenAlex Topics, assigned automatically; see the FAQ.

Keywords (from the repository)

Files

More About This Work

Institution University of Lusaka
Thesis Advisors Wise Mainga; Ian N. Banda derived
Degree Level Doctoral
Year 2019
Language en
derived values were not in the repository's record; they were read automatically from the thesis PDF and may contain errors.
Source Recordhttps://research.unilus.ac.zm/handle/123456789/132